Page 522 - 2018_Complete_14_Collection (1)_Neat
P. 522
WOOD
TABLE 2304.10.1—continued
FASTENING SCHEDULE
DESCRIPTION OF BUILDING ELEMENTS NUMBER AND TYPE OF FASTENER SPACING AND LOCATION
Wall
1
2-8d common (2 / × 0.131); or
2
2-10d box (3 × 0.128); or
18. 1 brace to each stud and plate Face nail
2-3 × 0.131 nails; or
7
2-3 14 gage staples, / crown
16
1
2-8d common (2 / × 0.131); or
19. 1 × 6 sheathing to each bearing 2 Face nail
2-10d box (3 × 0.128)
1
3-8d common (2 / × 0.131); or
20. 1 × 8 and wider sheathing to each bearing 2 Face nail
3-10d box (3 × 0.128)
Floor
1
3-8d common (2 / × 0.131); or floor
2
3-10d box (3 × 0.128); or
21. Joist to sill, top plate, or girder Toenail
3-3 × 0.131 nails; or
7
3-3 14 gage staples, / crown
16
1
8d common (2 / × 0.131); or
2
22. Rim joist, band joist, or blocking to top plate, 10d box (3 × 0.128); or 6 o.c., toenail
sill or other framing below 3 × 0.131 nails; or
7
3 14 gage staples, / crown
16
1
2-8d common (2 / × 0.131); or
23. 1 × 6 subfloor or less to each joist 2 Face nail
2-10d box (3 × 0.128)
1
24. 2 subfloor to joist or girder 2-16d common (3 / × 0.162) Face nail
2
25. 2 planks (plank & beam – floor & roof) 2-16d common (3 / × 0.162) Each bearing, face nail
1
2
32 o.c., face nail at top and bot-
20d common (4 × 0.192)
tom staggered on opposite sides
10d box (3 × 0.128); or
3 × 0.131 nails; or 24 o.c. face nail at top and bot-
tom staggered on opposite sides
3 14 gage staples, / crown
7
26. Built-up girders and beams, 2 lumber layers 16
And:
2-20d common (4 × 0.192); or
3-10d box (3 × 0.128); or Ends and at each splice, face nail
3-3 × 0.131 nails; or
7
3-3 14 gage staples, / crown
16
1
3-16d common (3 / × 0.162); or
2
4-10d box (3 × 0.128); or
27. Ledger strip supporting joists or rafters Each joist or rafter, face nail
4-3 × 0.131 nails; or
7
4-3 14 gage staples, / crown
16
3-16d common (3 / × 0.162); or
1
2
4-10d box (3 × 0.128); or
28. Joist to band joist or rim joist End nail
4-3 × 0.131 nails; or
4-3 14 gage staples, / crown
7
16
1
2-8d common (2 / × 0.131); or
2
2-10d box (3 × 0.128); or
29. Bridging or blocking to joist, rafter or truss Each end, toenail
2-3 × 0.131 nails; or
7
2-3 14 gage staples, / crown
16
(continued)
2018 INTERNATIONAL BUILDING CODE ® 495
Copyrighted © 2017 by, or licensed to, ICC (ALL RIGHTS RESERVED); licensed to UL, LLC pursuant to License Agreement with ICC. No further reproductions authorized or distribution authorized.
ANY UNAUTHROIZED REPRODUCTION OR DISTRIBUTION IS A VIOLATION OF THE FEDERAL COPYRIGHT ACT AND THE LICENSE AGREEMENT; AND SUBJECT TO CIVIL AND CRIMINAL PENALTIES THEREUNDER.