Page 285 - ICC IEBC 2018
P. 285

RESOURCE A



                                                   TABLE 3.2—continued
                                   FLOOR/CEILING ASSEMBLIES—STEEL STRUCTURAL ELEMENTS
           ITEM   MEMBRANE                                   PERFORMANCE      REFERENCE NUMBER            REC.
           CODE   THICKNESS       CONSTRUCTION DETAILS       LOAD   TIME  PRE-BMS-92 BMS-92 POST-BMS-92  NOTES  HOURS
                           Floor: 2″ reinforced concrete or 2″ precast
                                                  3
                           reinforced gypsum tile; Ceiling:  / ″ portland
                                                   4
                           cement-sand plaster 1:2 for scratch coat and
                                                                    1 hr.
                                                              See
                                                                                                            1
         F/C-S-29    3 / ″  1:3 for brown coat with 15 lbs. hydrated lime   Note 12 30 min.  1     12, 13,   1 / 2
                      4
                                                                                                     14
                           and  3  lbs. of short asbestos fiber bag  per
                                  3
                           cement or  / ″ sanded gypsum plaster 1:2 for
                                   4
                           scratch coat and 1:3 for brown coat.
                                 1
                           Floor: 2 / ″ reinforced  concrete or 2″ rein-
                                  4
                                                    1
         F/C-S-30    3 / ″  forced gypsum tile; the latter with  / ″ mortar   See  2 hrs.      1      12, 13,   2
                                                     4
                                       3
                      4
                                                                                                     14
                           finish; Ceiling:  / ″ sanded gypsum plaster;  Note 12
                                        4
                           1:2 for scratch coat and 1:3 for brown coat.
                                 1
                           Floor: 2 / ″ reinforced  concrete or 2″ rein-
                                  2
                                                    1
                           forced gypsum tile; the latter with  / ″ mortar   See  2 hrs.           12, 13,
                                                     4
                                                                                                            1
                                                         3
         F/C-S-31    3 / ″  finish; Ceiling: 1″ neat gypsum plaster or  / ″  Note 12 30 min.  1      14    2 / 2
                                                          4
                      4
                           gypsum-vermiculite plaster, ratio of gypsum
                           to fine vermiculite 2:1 to 3:1.
                                 1
                           Floor: 2 / ″ reinforced  concrete or 2″ rein-
                                  2
                                                    1
                           forced gypsum tile; the latter with  / ″ mortar
                                                              See
                                                     2
                                                         3
         F/C-S-32    3 / ″  finish; Ceiling: 1″ neat gypsum plaster or  / ″  Note 12  3 hrs.      1      12, 13,   3
                                                          4
                      4
                                                                                                     14
                           gypsum-vermiculite plaster, ratio of gypsum
                           to fine vermiculite 2:1 to 3:1.
                                 1
                           Floor: 2 / ″ reinforced  concrete or 2″ rein-
                                  2
                                                     1
                           forced gypsum slabs; the latter with  / ″ mor-  See                     12, 13,
                                                      2
         F/C-S-33    1″    tar  finish; Ceiling: 1″ gypsum-vermiculite   4 hrs.      1                      4
                                                            Note 12                                  14
                           plaster applied on metal lath and ratio 2:1 to
                           3:1 gypsum to vermiculite by weight.
                           Floor: 2″ reinforced concrete or 2″ precast
                           reinforced portland cement concrete or gyp-
                           sum slabs; precast slabs to be finished with
                     1
         F/C-S-34   2 / ″  1 / ″ mortar top coat; Ceiling: 2″ precast rein-  See  4 hrs.      1      12, 13,   4
                      2     4                               Note 12                                  14
                           forced gypsum tile, anchored  into  beams
                           with metal ties or clips and covered with  / ″
                                                        1
                                                         2
                           1:3 sanded gypsum plaster.
                           Floor: 1:3:6 portland cement, sand and gravel
                           concrete applied directly to the top of steel
                           units and 1 / ″ thick at top of cells, plus
                                   1
                                    2
                                1
         F/C-S-35    1″    1 / ″ 1:2 / ″  cement-sand finish, total thick-  See  3 hrs.      1      15, 16,   3
                                 2
                            2
                           ness at top of cells, 2″ ; Ceiling: 1″ neat    Note 15                  17, 18
                           gypsum plaster, back of lath 2″  or more from
                           underside of cellular steel.
                           Floor: same as F/C-S-35; Ceiling: 1″ gyp-
         F/C-S-36    1″    sum-vermiculite plaster (ratio of gypsum to   See  4 hrs.      1        15, 16,   4
                           vermiculite 2:1 to 3:1), the back of lath 2″ or  Note 15                17, 18
                           more from under-side of cellular steel.
                           Floor:  same as F/C-S-35; Ceiling: 1″ neat
         F/C-S-37    1″    gypsum plaster; back of lath 9″ or more from   See  4 hrs.      1       15, 16,   4
                                                            Note 15                                17, 18
                           underside of cellular steel.
                           Floor: same as F/C-S-35; Ceiling: 1″ gyp-
         F/C-S-38    1″    sum-vermiculite plaster (ratio of gypsum to   See  5 hrs.      1        15, 16,  5
                           vermiculite 2:1 to 3:1), the back of lath being  Note 15                 17,18
                           9″ or more from underside of cellular steel.
                                                        (continued)
         266                                                            2018 INTERNATIONAL EXISTING BUILDING CODE  ®
  Copyrighted © 2017 by, or licensed to, ICC (ALL RIGHTS RESERVED); licensed to UL, LLC pursuant to License Agreement with ICC. No further reproductions authorized or distribution authorized.
  ANY UNAUTHROIZED REPRODUCTION OR DISTRIBUTION IS A VIOLATION OF THE FEDERAL COPYRIGHT ACT AND THE LICENSE AGREEMENT; AND SUBJECT TO CIVIL AND CRIMINAL PENALTIES THEREUNDER.
   280   281   282   283   284   285   286   287   288   289   290