Page 17 - KING PLOW ARTS CENTER-Lighting Replacement Guide
P. 17

PHASE 3 (Building 949)













                                          3 Architectural  Wall packs
                                  Northside of Bldg. (Facing Marietta Street)



                                    Existing Wall Pack Types





               3 Architectural  Wall Packs
                   Northside of Bldg.
                 (Facing Marietta Street)                                           1 Quarter Round Wall Pack














































                       2 Architectural Wall packs | 1 Quarter Round Wall pack
                                    Front of Bldg. (Facing Parking Lot 6)

                                     1‐Caged CFL (Under Entry Awning)





                                   2017 Installation Lighting Replacement Guide                                13
   12   13   14   15   16   17   18   19   20   21   22