Page 35 - KING PLOW ARTS CENTER-Lighting Replacement Guide
P. 35

PHASE 4 Building T&S (887)


                                                                                               EXTERIOR


























                              Perspective : Via Rear Entry

                                               Parking Lot 6






             SCOPE OF WORK
             EXTERIOR ONLY | COURTYARD | BUILDING N SUITE ENTRYWAY




             MATERIALS
                116 Screw In CFL A‐Lamp (High Wattage)

                3 Linear FLUORESCENT 250W Wall Pack
             NOTES:

             Linear FLUORESCENT 250W Wall Pack

                3‐Wallpacks (RR Facing) Leading into Courtyard *LIFT
             CFL Screw In’s

                1‐Above Suite T‐102
                2‐RR Track Facing ‐ Art Initiative Entry/Exit

                5‐Exterior Facing Marietta Street(Gooseneck CFL) *LIFT
                1‐Rear Entry near Bldg. M (RR Tracks Facing) *LIFT

                3‐Short Poles (Courtyard)

                2‐Exterior Facing Marietta Street   (Loading Dock Entrance) *LIFT
                2‐(Bldg. N)Caged CFL‐Vehicle Media Entry & Hanging CFL‐Mgmt. Office"




                                   2017 Installation Lighting Replacement Guide                                30
   30   31   32   33   34   35   36   37   38   39   40