Page 47 - KING PLOW ARTS CENTER-Lighting Replacement Guide
P. 47

PHASE 7 Building M

                                                                                                INTERIOR


















                                                                           PERSPECTIVE

                                                      Entry from door closest to Bldg. S exit.

                                                                      TWO‐STORY BLDG.*













                  SCOPE OF WORK

                  INTERIOR ‐ Two Story Building



                  Recognition Point:

                  Entry through Courtyard. TS Building on Right



                  Materials

                       28 CFL Screw In CFL A‐Lamp (High Wattage)

                       6 Linear Fluorescent  4 Foot T12 (40W)
                       3 Halogen Exception (Halogen)




                  NOTES:
                  See Individual Pages










                                   2017 Installation Lighting Replacement Guide                                39
   42   43   44   45   46   47   48   49   50   51   52