Page 32 - bitbook
P. 32

23
 P Performance Evaluation Report on Rural Roads Constructed Using CRRI-Bitchem Cold Mix in Different District of Assam during 2008-2009 erformance Evaluation Report on Rural Roads Constructed Using CRRI-Bitchem Cold Mix in Different District of Assam during 2008-2009







 Table 7(b). Details of  Road Sections for Performance Observation




 Sl.   Road Name   Contractor   Pkg.No   Year of   Date of   Type of Mix used /   Present Condition
 No.    Name   Construction   Evaluation   Road Length
             rd
 13.   Borihat to Borpratima Phulguri   Saraighat   PMGSY   2009   3  June-2013   Cold Mix Surfacing   Good condition as 4years
 Road, Mirza, Kamrup   Associates   AS-11-129   Length =11kms.   old road.
             rd
 14.   Urput to Kumaria Road, Mirza,     Anil Das   PMGSY   2009   3  June-2013   Hot Mix Surfacing   Poor,  Most of the area pot
 Kamrup   AS-11-100         Length=2kms             hole & crack observed.
 15.   Bezera – Balikuchi-Rajkhuwa   Anupam   PMGSY   2009   3  June-2013   Cold Mix Surfacing   Good condition as 4years
             rd
 Suba Road,Bazera, Kamrup   Kakati   AS-11-135   Length=3kms   old road.
             rd
 16.   NG Mandakata-Salmara-  Anupam   PMGSY   2009   3  June-2013   Hot  Mix Surfacing   Good condition as 4years
 Simalibari Road, Bezera, Kamrup   Kakati   AS-11-135   Length=3kms   old road.
 17.   NH-31 Tinali to Matiapahar   Rang Pvt.Ltd.   PMGSY   2009   3  June-2013   Cold Mix Surfacing   Good condition as 4years
             rd
 Road, North Guwahati, Kamrup   AS-11-137   Length=3kms   old road.
 18.   Barama to Bhalukdanga Road,   A.K.Boro   NLCPR   2009   5  June-2013   Cold Mix Surfacing   Good condition as 4years
             th
 Barama, Nalbari            Length=9kms             old road.
             th
 19.   Tihu to Mathurapur Road,   Anupam   PMGSY   2009   5  June-2013   Cold Mix Surfacing   Good condition as 4years
 Nalbari   Sarma     AS-20-69   Length=8kms         old road.
 20.   Borama to Kathailkuchi Road,   Anupam   NL-06   2009   5  June-2013   Hot  Mix Surfacing   Poor condition as 4years
             th
 Barama, Nalbari   Sarma   (W. Bank)   Length=6kms    old road.
 21.   Tihu Palister Road, Nathkuchi,    Anupam   PMGSY   2009   5  June-2013   Cold Mix Surfacing   Good condition as 4years
             th
 Nalbari   Sarma   AS-24-30   Length=6.4kms         old road.)
 22.   Tukurakuchi to Batbari Road,   Anupam   PMGSY   2009   5  June-2013   Hot  Mix Surfacing   Good condition as 4years
             th
 Silbari,  Baksa (BTAD)   Sarma   AS-24-18   Length=7.0kms    old road.
             th
 23.   Hazua to Nalbari Road, Baksa   Anupam   PMGSY   2009   5  June-2013   Cold Mix Surfacing   Good condition as 4years
 (BTAD)   Sarma   AS-24-44   Length=4kms& 12kms  old road.











    QSP/MR/19/ ACED/BTCM/214/2013                                                                                                                                                   CSIR-NEIST/CNP-462 QSP/MR/19/ ACED/BTCM/214/2013
   27   28   29   30   31   32   33   34   35   36   37