Feeders-Load shedding – XT4 Master







                    Purpose:

                    Control for the release of up to 16

                    customer feeder circuit breakers
                    depending on the actual available
                    generator power, in order to limit the site

                    load in case of a mains failure and in
                    island mode.


                    Visualisation


                    Display per feeder:
                    Feeder breaker open/closed

                    Actual feeder consumer power (if
                    available)


                    Plant:


                    Maximum available generators power

                    Maximum available reserve power
                    Electrical consumer power