Page 135 - Engine IQflip'21
P. 135
Feeders-Load shedding – XT4 Master
Purpose:
Control for the release of up to 16
customer feeder circuit breakers
depending on the actual available
generator power, in order to limit the site
load in case of a mains failure and in
island mode.
Visualisation
Display per feeder:
Feeder breaker open/closed
Actual feeder consumer power (if
available)
Plant:
Maximum available generators power
Maximum available reserve power
Electrical consumer power
All rights reserved May 19