Page 250 - Engine IQflip'21
P. 250

Flare gas installation Argentina











                           This installation runs together with more

                           than 20 engines an other site in island mode,
                           providing the power for oil production

                           equipment.


                            Gas composition:


                            CH   4              44 %

                            C H   6             1.0%
                              2
                            C H   8             1.1%
                              3

                            C H   10            6.5%
                              4
                            N 2                 1.5%

                            CO   2              46.0%

                            Commissioning: 2004                                                                J.F. Secco
                                                                                                               15 x JGS 420 GS-S.L


                                                                                                               Electr. Output: 21,225kW




                                    All rights reserved      May 19
   245   246   247   248   249   250   251   252   253   254   255