Page 94 - HiPoint Plumbing - Custom Price Book
P. 94
I. Trenching/Excavation (ITA-0315-0010) ADDED SOIL EXCAVATION.
Hi-Point Plumbing, Lic # 296106c, © Copyright
1 square metre x 15cm deep units. Not to exceed 60cm deep. Includes assistance.
(ITA-0316-0030) TREE/SHRUB INTERFERENCE
Regular Difficult Loyalty
Extra excavation around roots or beneath branches.
(ITA-0317-0015) HARD SOIL/LOOSE ROCK - OBSTRUCTIONS
Thereafter: $20.00 $29.00 $15.00
Regular Difficult Loyalty
Add to other excavation tasks when excavation requires pick or rock bar. If mechanical equipment is needed contact office.
(ITA-0318-0060) TUNNEL UNDER PAVEMENT 1M
Thereafter: $61.00 $88.00 $44.00
Regular Difficult Loyalty
Thereafter: $30.00 $44.00 $22.00
Tunnel under pavement 1M for water line installation.
(ITA-0319-0045) TUNNEL TO 45CM
Regular Difficult Loyalty
Thereafter: $122.00 $177.00 $89.00
For re-routing or gaining access to piping. Not to exceed 60cm depth.
Regular Difficult Loyalty