Page 95 - HiPoint Plumbing - Custom Price Book
P. 95
I. Trenching/Excavation
(ITA-0320-0420) ADD TUNNEL AND BACKFILL 1.5M SECTION
Hi-Point Plumbing, Lic # 296106c, © Copyright
Add tunnel and backfill 1.5M section.
(ITA-0321-0330) BASIC CONCRETE INGRESS
Regular Difficult Loyalty
Thereafter: $947.00 $1332.00 $717.00
Excavation of concrete for pipe repair. Includes: Break, remove and replace up to 1m sq of concrete, 10cm max. thickness. Also includes standard soil excavation to 45cm max. depth. Includes standard dust abatement and no fuss clean up service. (SEE SOIL EXCAVATION TASKS for further excavation)
(ITA-0322-0020) ADDITIONAL CONCRETE INGRESS
Regular Difficult Loyalty
Additional concrete removal, excavation and concrete replacement. Priced per 5cm x 5cm x 10cm
(ITA-0323-0210) SAW & REMOVE CONCRETE - STD MINIMUM
Thereafter: $696.00 $999.00 $516.00
Regular Difficult Loyalty
Thereafter: $41.00 $59.00 $30.00
Saw and remove concrete, up to 6 sq metres, 15cm thick. Simple access. Does not include soil excavation and soil replacement.
(ITA-0324-0010) SAW & REMOVE CONCRETE - STD ADDITIONAL
Regular Difficult Loyalty
Thereafter: $425.00 $618.00 $310.00
Additional saw and removal- priced per sq metre.
Regular Difficult Loyalty
Thereafter: $20.00 $29.00 $15.00

