Page 23 - fkppc book-1
P. 23
LAMPIRAN FKPPC2 - 6
HARGA PATOKAN DASAR OVER VB PERUMAHAN CIJANTUNG II
PBB ONLINE MULAI 1993 - 2017
Rumah Type K (K13)
NOMOR OBJEK PAJAK 317201000501 3.17201E+17 3.17201E+17 3.17201E+17 3.17201E+17 3.17201E+17
3.17201E+17700450
317201000501700450
TAHUN PAJAK 1999 1998 1997 1996 1995
NJOP BUMI/ M2 285,000 285,000 285,000 285,000 200,000
NJOP BANG./ M2 225,000 225,000 310,000 264,000 225,000
NJOP BUMI BERSAMA/ M2 0 0 0 0 0
NJOP BANG. BERSAMA/ M2 0 0 0 0 0
TOTAL NJOP 49,125,000 49,125,000 54,225,000 51,465,000 38,500,000
NJOPTKP 0 0 8,000,000 8,000,000 8,000,000
NJOP 49,125,000 49,125,000 54,225,000 51,465,000 38,500,000
NJKP (%) 20 20 20 20 20
NJKP 9,825,000 9,825,000 9,245,000 8,693,000 6,100,000
TARIF (%) .5 .5 .5 .5 .5
PBB YG HARUS DIBAYAR SPPT 41,125 41,125 46,225 43,465 30,500
TGL JATUH TEMPO SPPT 4/28/2017 4/28/2017 4/28/2017 4/28/2017 4/28/2017
STATUS LUNAS BELUM LUNAS BELUM LUNAS LUNAS LUNAS
Harga Over VB menurut Tahun
MINIMUM 49,125,000 49,125,000 54,225,000 51,465,000 38,500,000 - -
NEGOSIASI 73,687,500 73,687,500 81,337,500 77,197,500 57,750,000 - -
MAKSIMUM 98,250,000 98,250,000 108,450,000 102,930,000 77,000,000 - -