Page 7 - 2019 1st Quarter JSOD shift 3 Statistical Report
P. 7

Response Time and
                    Proactivity

Sudden test was         J-03
conducted during        J-04
2019 1st quarter to     J-05
evaluate and analyze    J-06
JSOD shift 3            J-09
patrolmen response      J-10
time to the incident  J-10-A
scene

                                   0 0.5 1 1.5 2 2.5

                                   J-10-A  J-10  J-09                         J-06           J-05  J-04  J-03

Required Average of Response time  2.33    2.33  2.33                         2.33           2.33  2.33  2.33

Response Time                      2222121

                                           Required Average of Response time  Response Time
   2   3   4   5   6   7   8   9   10   11   12