Page 256 - Statistices of Strategic Road Networks of Nepal (FY 2017-18)
P. 256
SN Historical/ Present Year (BS) Office Head/ Chief
Name of the Office Engineer/ Director General Milestone
From To
Implementation of Transport Policy
21 Department of Roads 2056/6 2058/9 Ananda Prasad Khanal
Initiation for preparation of 20 years Master Plan of DOR
Initiation for Preparation of standard Designs & Drawings of Roads
& Bridges
Initiation for establishing SRN in GIS based data base
22 Department of Roads 2058/9 2061/9 Madad Gopal Malekhu
Implementation of RMDP
Formation of Road Board
Finalization of standard Design & Drawings Roads & Bridges
Finalizing GIS based database of SRN
23 Department of Roads 2061/9 2064/2 Durga Prasad K.C. Finalization of Priority Investment plan-II
Finalization of Subregional Transport
Facilitation Project
Initiation of Terai Road Project (Indian Grant)
Feasibility Study of North-South Fast Track
Implementation of RSDP (WB)
24 Department of Roads 2064/2 2066/3 Tulsi Prasad Sitaula
Implementation of e-Procument
Implementation of Widening of Koteshwor-Bhaktapur Sector of
Araniko Highway (JICA)
Implementation of Road Sector Connectivity Project (ADB)
Establishment of 2 separate branches/project in DOR
(ACQMP&Bridge)(Indian Grant)
Widespread continuation of e-bidding procedure within all DOR
offices
Hulaki Lokmarga project established for effective implementation of
road & bridge works
25 Department of Roads 2066/3 2067/10 Ram Kumar Lamsal Recognition and effective implementation of North-South Corridor
Road Project
Start of Emergency Flood DamageRehabilitation Project (EFDRP)
Initiation of STEP, RCP, TPFF
Initiation of PPP in road works.
Initiation of BMIS System in Department of Roads
Completion of Kathmandu-Bhaktapur Road Project.
26 Department of Roads 2067/10 2068/4 Hariom Srivastav Continuation of Road Sector Development Projects.
Continuation of North South Corridor Road Projects.
Continuation of Road Improvement Project.
Initiation of Kathmandu Valley Urban Transportation Master Plan.
Inititiation of implementation of Flyover at at major junctions of
Kathmandu valley.
Exposing Nepalese expertise in Bioengineering.
Internationally awarded with PIARC prize in 2011.
27 Department of Roads 2068/4 2068/9 Indu Sharma Dhakal
Initiation of road widening works in Kathmandu valley.
Continuation of Road Sector Development Projects.
Continuation of North South Corridor Road Projects.
Continuation of Road Improvement Project
240