Page 24 - Barr&Barr_HealthcarePortfolio_CTChildrens.indd
P. 24

Maimonides Medical Center

                                                    Facilities Modernization


































          SIZE                     OWNER
          81,000 square feet       Maimonides Medical Center
          CONTRACT TYPE            ARCHITECT
          CM-at-Risk               PEAPC, LSGS, Guenther 5
                                   Associates Architects






                                                                       PROJECT DETAILS

          Th  e Maimonides Medical Center Major Modernization Project consists      •  Expansion of the Emergency Department
          of the construction of a nine (9) story addition to the present Aaron
                                                                          •  Expansion of Neo-Natal ICU
          Building.  Th  e new building also connects to the existing Gellman
          Building.  A new elevator and utility core serves all three (3) buildings.     •  Replacement of Medical/Surgical beds

                                                                          •   Increase in the number of Operating Rooms and
          Renovation of the existing Aaron building was done with the new
                                                                           replacement of existing Operating Rooms
          construction.
                                                                          •  Replacement of Medical ICU beds
          In addition, the new Ambulatory Surgery facility was built in the
          Garage Basement across from the new addition on 48th Street.  A two
          (2) story bridge connects this facility to the new building as a direct
          connection between in-patient and Ambulatory Surgery.  New elevators
          were constructed in the Garage to complement this connection.
   19   20   21   22   23   24   25   26   27   28