Page 45 - BarrandBarr_RISD_5.19.2017
P. 45

Pamela Galeota

                                                          Project Manager


            EDUCATION
            Northeastern University
            BSc Education

            SPECIAL TRAINING
            OSHA 10 - Hour Training
            SCCE Certifi ed
            (Society of Corporate Compliance & Ethics)
            YEARS OF EXPERIENCE
            28
            YEARS WITH BARR & BARR
            2





           Pam earns the kind of trust that binds a team with leadership - she has a talent for identifying and averting potential problems
           that would eff ect cost and schedule. Marshalling the team to quickly and creatively resolve issues when they do arise. Pam
           acts solely in your best interest as the owner. You can count on her for accurate review of budgeting, realistic scheduling
           and phasing plans.


           SIMILAR PROJECTS
           Framingham State University (DCAMM), Framingham, MA    MIT Wong Auditorium, Cambridge, MA
           188,000 SF, LEED Silver. Th  e academic facility upgrade includes a  107,991 SF. Auditorium renovation in 4-story fully occupied
           four-story addition that houses 16 teaching laboratories, including  building;   Auditorium capacity increased to 291 seats with ADA
           related prep and supply spaces, plus faculty research spaces, joined to  accessible entries within existing fl oor plan.  Renovation included
           the existing facility by a four-story atrium space. Selective interior  new ceilings, lighting system, new seating plan and stairways,
           renovations in the existing Hemenway Hall and the Annex provide  fl ooring, rails, a/v system.
           a fully accessible, substantially improved teaching environment.
                                                                  Boston University, Boston, MA
           MIT E17 Atlas Center, Cambridge, MA                    1M SF. Over 18 years of work with Boston University including new
           25,000 SF. Th  e Atlas Service Center was created as a gateway to  buildings, renovations and additions for food service, administrative,
           MIT’s goal to streamline administrative systems and processes while  athletic facilities, classrooms, libraries, research/teaching labs,
           making the campus experience more welcoming for students and  dormitories and WBUR radio station.
           faculty.  Th  e purpose was to create an online service nexus with
           systems, tools, information and resources that aligns service delivery  U.S. Land Port of Entry, Van Buren, ME
           in a one-stop shop experience and consolidates many activities and  50,000 SF. Th  is project was a design build high security border
           services in one location.  Services are rendered via customer service  crossing station that was comprised of three individual buildings.  Th is
           reps and self-service kiosks collaborating space and technology with  project received the GSA Design Excellence Award and 2011 North
           people, technology and space.   Th  e Atlas Service Center initiative  American Holcim Foundation Award for Sustainable Construction.
           is focus on identifying both one-time and everyday needs-such as on
           boarding and orientation, parking and commuter services, ID cards,  U.S. Land Port of Entry, Calais, ME
           I9 processes, tech  cash, in-person payroll and benefi ts transactions.  100,000 SF. Th  is LEED Gold landmark border crossing station is
                                                                  located in the northeast corner of Maine and was constructed for the
           MIT E17, E18, E19 Renovations, Cambridge, MA           GSA as well as the United States Government in partnership with
           80,903 SF. Complex of existing six and 7-story buildings that  the Canadian Government. Th  e building consisted of a fi tness area,
           house a mix of classroom, shop, offi  ce,laboratory and vivarium  locker rooms, labs, classroom and training areas, indoor shooting
           space. Goal of project was to renovate entire second,third and  range, library, kitchen and state of the art security.
           fourth fl oors of Bldg. E17/18, part of the fi rst fl oor of E17, and
           parts of the second, sixth and seventh fl oors of E19 for new users.   Maimonides School, Brookline, MA
           New space is generally offi  ce with some used as classroom space.  80,000 SF. Renovation and expansion of the existing school including
           Involvement commenced during pre-construction phase for design  a new Shul and administrative wing addition.  All work was performed
           constructability and best practices, recommendations for alternate  while the building remained fully occupied.
           materials to reduce costs with shorter lead times. Involved in V/E
           process; provided SD/DD/GMP @ CD estimates; scheduling
           & logistics planning, procurement schedules; sub-contractor bid
           packages & award recommendations to client. Selective demo
           required and related repairs for investigation.
   40   41   42   43   44   45   46   47   48   49   50