Framingham State University
                                    Upgrade to Science and Academic Facilities at Hemenway Hall



































          SIZE                     OWNER
          188,000 square feet      Framingham State University
                                   (DCAMM)
          CONSTRUCTION COST
          $63.5 million            ARCHITECT
                                   Ellenzweig






                                                                 PROJECT DETAILS
         Th  is project consists of a four-story addition, plus basement and   •  Massachusetts Division of Capital Asset Management &
         an enclosed penthouse, that will house 16 teaching laboratories,   Maintenance (DCAMM) funded project.
         including related prep and supply spaces, plus faculty research   •  A high standard of sustainability through the use
                                                                       of recycled and locally extracted and manufactured
         spaces, joined to the existing facility by a four-story atrium space.
                                                                       materials, low-VOC building products, low-mercury
         Selective interior renovations in the existing Hemenway Hall and   fl uorescent lighting, storm water collection. LEED Silver
         the Annex will provide a fully accessible, substantially improved   certifi cation.
         teaching environment. Th  e facades of Hemenway Hall will receive   •  Th  e renovations upgraded the seismic, structural,
         repairs and improvements, including new thermal windows.      mechanical and electrical systems.
                                                                      •  Extensive hazardous materials abatement was necessary
         Th  is is the largest academic building on campus and home to   for the existing Hemenway Hall and Annex buildings.
         the University’s Family and Consumer Sciences, Mathematics,   •  Early bid packages were required to commence
         Nursing, Biology, Chemistry and Food Science, Geography,      construction prior to the completion of the fi nal design
         Physics and Earth Science and Psychology departments. Also    documents. Th  ese early bid packages included selective
                                                                       demo, selective abatement, MEP infrastructure re-routing
         the Food Pilot Plant Laboratory, the green house and the Child   and extensive site work.
         Development Laboratory.
                                                                      •  Original 50% Design Development project estimate came
                                                                       in at 50% higher ($20 million) than the original project
                                                                       budget.  Th  rough intense value engineering and project re-
                                                                       design the team reached a GMP that was within 1% of the
                                                                       latest project estimate (70% Construction Documents).
                                                                      •  ADA upgrades throughout the existing buildings
                                                                       including but not limited to, door operators, ramp
                                                                       revisions, railing upgrades & bathroom upgrades.