Page 80 - Barr&Barr_Technical Proposal
P. 80
460 West 34th St., 10th Fl.
New York, NY 10001
Phone: (212) 563-2330
Fax: (212) 967-2297
Construction Entrance www.barrandbarr.com
to Graduate Hotel Maintain pedestrian access
North Loop Road closed. VEEC
Construction traffic ONLY during Sidewalk shed at pick zone (N.I.C.)
work hours. Emergency Access Maintain
after hours. pedestrian/access during
Roof Protection construction
(N.I.C.)
Maintain pedestrian Man gate
access during construction GS
Air Monitoring Station
Roof Protection
8' Plywood fence on 12'
concrete Jersey Barriers 20'
per DOB regulations
w/Temp Street Lights
Fence to separate jobsites
Flagman as
required for
deliveries. 10' Verizon Executive Covered Pedestrian
Education Center
Easeded Loading Dock 20' Walkway (Typ) Verizon Executive
curb for Education Center at
truck access the NYCTech
Campus
Hoist Staging ROOSEVELT ISLAND
Area NEW YORK, NY 10044
Air Monitoring Station
Overhead Protection to
enter VEEC jobsite 13'
13' 20'
Man gate
20' N
3 07/03117 50% CD
2 06/07/17 Design/Build Facade Package
1 01/12/17 RFP
Man gate Security Guard
NO. DATE: ISSUED:
Maintain Clear Lane
for Emergency Access Air Monitoring Station
SITE LOGISTICS
PLAN -
Construction Entrance to VEEC - 16' Plywood fence at Overhead Protection- Maintain Clear Lane 8' Plywood fence on Jersey barriers painted
13' gate w/Tracking Pad painted green per DOB Chapter 33 regulations for Emergency Access green per DOB Chapter 33 regulations Facade
SCALE: NTS
JOB NO:
DRAWN BY: RG
CHECKED BY: TL
SL-03