Massachusetts Institute of Technology
                                                  Renovations to Building E25



































          SIZE                     OWNER
          134,755 square feet      Massachusetts Institute of
                                   Technology
          CONTRACT TYPE
          Construction Manager-at-Risk  ARCHITECT
                                   Imai Keller Moore Architects






                                                                       PROJECT DETAILS
         Th  is is the fi rst new out of the ground non-science pure academic building       •   Massachusetts Division of Capital Asset
         built on campus in the last 15 years. Th  e four story Integrative Learning   Management & Maintenance (DCAMM)
                                                                           funded project.
         Center consists of a mix of department faculty offi  ce space, teaching labs,
         long distance learning classrooms, a fully operational Broadcast Studio,       •   OSHA Partnership with the U.S. Labor
         Black Box Journalism Studio and classrooms. Th  ere are specialized rooms   Department to emphasize employee training
                                                                           and an ongoing commitment to partner with
         for, fi lm editing rooms, fi lm screening classrooms, computer rooms and
                                                                           all subcontractors to identify and eliminate any
         speech perception and auditory phonetics labs. Th  e classroom space
                                                                           hazards before they become an issue.
         consists of 17 high technology classrooms and lecture halls with a total
                                                                          •   Building Information Modeling (BIM) was
         capacity of over 2,000 seats.   Th  e AV systems are state of the art which
                                                                           utilized for clash detection, constructability
         is showcased in every teaching lab, classroom space and lecture halls
                                                                           review as well as MEP and Architectural
         fi lm screening rooms etc.  Th  e project also included a signifi cant utility   coordination.    It was also utilized for 4D
         corridor component that created a bypass loop for steam, chilled water,   construction sequencing/scheduling analysis.
         electric and telecommunication.  Th  e project also included the removal
                                                                          •   A high standard of sustainability includes
         and replacement of the dike and spillway for the Campus Pond.  Working   natural lighting, automatic lighting controls,
         the requirements of the Corp of Engineers and the local conservation   energy effi  cient HVAC system including heat-
         commission was accomplished seamlessly resulting in an on time and   recovery system and low fl ow plumbing fi xtures.
                                                                           Pursuing LEED Gold certifi cation.
         under budget project.
                                                                          •   Extensive site coordination due to the project’s
                                                                           location in the heart of the UMass Amherst
                                                                           campus adjacent to the Campus Center, Student
                                                                           Union, the Campus Pond and the Hasbrouk
                                                                           Research Laboratory.