Sustainability                                           Post-Acceptance Phase.  Here is where we focus on training, and
         While many construction managers are averse to new materials and  concentrate on developing seasonal testing, documentation and
         construction techniques, we feel it is our duty to be committed to  reporting to maintain all correct standards.
         advancing sustainability in every project we undertake. And the work
         of fulfi lling our responsibility to the environment absolutely begins  As part of our diligent approach to building, commissioning is an
         at the earliest stages of design in preconstruction.     essential tool to help our project team deliver a fully functional and
                                                                  validated project, on-time and within budget.
         An active member of the US Green Building Council, Barr & Barr
         has been involved in numerous sustainability-driven projects. Our  Number of staff  working for the fi rm in the local offi  ce
         employees are especially well-versed in sustainable construction,  Barr & Barr employs Approximately 172 people. Barr & Barr’s Mid
         with backgrounds in LEED certifi cation. Th  is not only benefi ts the  Atlantic Staffi  ng is as Follows:
         environment, but also provides signifi cantly reduced energy costs for
         our clients.  Some examples of how our green eff orts are impacting  Executives/Sr. Offi  cials and Managers - 11
         our projects:                                            Professional Support - 14
                                                                  Safety - 7
           •  Sustainable sites are realized through storm waste
                                                                  Administrative Support - 27
             management, light pollution and landscape design.
                                                                  Supervisory Staff  - 52
           •  Water effi  ciency is achieved by using low-water landscaping
             and effi  cient plumbing.                            Total Mid-Atlantic Region: 111

           •  Energy and atmosphere are impacted through optimal energy
             performance of the building itself, the type of equipment
             installed and CFC reductions.                        Please see the following pages for Barr & Barr’s current
                                                                  workload of both preconstruction and construction
           •  Materials and resources are saved via reuse, recycled content,   projects.
             use of local materials and a keen eye on construction-waste
             management.
           •  Indoor environmental quality is maintained with overall air
             quality management, building management systems, tobacco/
             smoke control, day lighting, and low-VOC materials.

           •  Geothermal is attained by using full geothermal and HVAC
             systems.

           •  Waste diversion is attained by implementing our waste
             materials management program, achieving a landfi ll diversion
             rate of over 95%.


         Commissioning
         As consummate builders with a keen focus on integrity and the
         bottom line, we strongly recommend utilizing commissioning agents
         throughout all phases of our projects.  With both technology and
         energy conservation becoming major factors in all of our projects, not
         to mention a LEED requirement, commissioning agents will help to
         ensure continuity from the design phase through to post-acceptance.


         Design Phase. We will collaborate closely with the commissioning
         agent to develop a plan, bidding process and project requirements to
         ensure that we are LEEDs compatible.

         Construction Phase.  Th  rough coordination with commissioning
         activities, Barr & Barr team members and subcontractors, we ensure
         that the construction process remains compliant with best practices.

         Acceptance Phase.  In this phase we will verify the results of design,
         construction and prefunctional testing activities.  We have incorporated
         the use of tablets in the fi eld to provide access to project fi les,
         documentation and solutions as well as commissioning applications.