Page 28 - UNIT 5- FLEXIBLE PAVEMENT DESIGN
P. 28

Civil Engineering Department  | DCC3113 : Highway & Traffic Engineering




                                                       Design Procedure:





                       Capacity Estimation




          Maximum Hourly Capacity, c


           c            =             I  x  R  x   T


           Where        I   =   Ideal hourly capacity (Refer Table 3.2 in (Arahan Teknik (Jalan) 5/85)


                        R  =  Roadway Reduction Factor (Refer Table 3.3 in (Arahan Teknik (Jalan) 5/85)

                        T   =  Traffic Reduction Factor (Refer Table 3.4 in (Arahan Teknik (Jalan) 5/85)


















                                                                                                                                   HOME
          Prepared by : SITI ZURAIFA BINTI MD SAH, zuraifa@pmu.edu.my
   23   24   25   26   27   28   29   30   31   32   33