Page 40 - UNIT 6 - HIGHWAY MAINTENANCE
P. 40

Civil Engineering Department  | DCC3113 : Highway & Traffic Engineering




                                          Refixation (temporary maintenance)





              Crack sealing

                    Closing cracks in the pavement & road-base to protect against the entry of water.
                    Performed with clean & fill the cracks with a mixture of slurry (slurry  mixture) or
                     bitumen & sand cover.







































          Prepared by : SITI ZURAIFA BINTI MD SAH, zuraifa@pmu.edu.my
   35   36   37   38   39   40   41   42   43   44   45