Page 40 - UNIT 6 - HIGHWAY MAINTENANCE
P. 40
Civil Engineering Department | DCC3113 : Highway & Traffic Engineering
Refixation (temporary maintenance)
Crack sealing
Closing cracks in the pavement & road-base to protect against the entry of water.
Performed with clean & fill the cracks with a mixture of slurry (slurry mixture) or
bitumen & sand cover.
Prepared by : SITI ZURAIFA BINTI MD SAH, zuraifa@pmu.edu.my