Page 54 - UNIT 3 - CONSTRUCTION OF FLEXIBLE PAVEMENT
P. 54

Civil Engineering Department  | DCC3113 : Highway & Traffic Engineering





   Concept                                                         Paver




               Dump truck transfer the premix into the paver’s hopper (a).

               The conveyer carried the premix from hopper (a) to auger (b).




















                                                                                a

                       b
















                                                                                                                                   HOME
          Prepared by : SITI ZURAIFA BINTI MD SAH, zuraifa@pmu.edu.my
   49   50   51   52   53   54   55   56   57   58   59