Page 75 - Unit 2: Pavement Material
P. 75

Civil Engineering Department  | DCC3113 : Highway & Traffic Engineering





  Premix                                              Basin of Aggregate





             Three different sizes of aggregate were mixed
              in the basin.
             The basin have motor that have 3 different
              speed (ratio) to release the aggregates.

             These processes are controlled by operated
              control room.
































                                                                                                                                   HOME
          Prepared by : SITI ZURAIFA BINTI MD SAH, zuraifa@pmu.edu.my
   70   71   72   73   74   75   76   77   78   79   80