Page 75 - Unit 2: Pavement Material
P. 75
Civil Engineering Department | DCC3113 : Highway & Traffic Engineering
Premix Basin of Aggregate
Three different sizes of aggregate were mixed
in the basin.
The basin have motor that have 3 different
speed (ratio) to release the aggregates.
These processes are controlled by operated
control room.
HOME
Prepared by : SITI ZURAIFA BINTI MD SAH, zuraifa@pmu.edu.my