Page 908 - (A) Mammoth (998pp)
P. 908

SCHEDULE OF TEST RESULTS
FOR THE PRIMARY DISTRIBUTION BOARD
TO BE COMPLETED ONLY IF THE DISTRIBUTION BOARD IS NOT CONNECTED DIRECTLY TO THE ORIGIN OF THE INSTALLATION
TEST RESULTS
Test instruments (serial numbers) used:
yes
* See note below
Ö IÙ
Characteristics at this distribution board Confirmation of supply polarity
É Operating times At IÜ ms of associated
kA RCD (if any) At 5IÜ ms
Earth fault loop impedance
Insulation resistance
Continuity
6111-754/10031/3020 6111-754/10031/3020
RCD
Multi function
Other
*
0.08
*
2.88
6111-754/10031/3020
Circuit impedances (É)
Insulation resistance
Polarity Neutral/Earth Ú
(MÉ) (á)
Maximum measured earth fault loop impedance, Ö
*Seenotebelow
(É)
RCD operating times
rã (Line)
Ring final circuits (measured end to
rÐ (Neutral)
only end)
rå (cpc)
All circuits
(At least one column to be completed)
Rã+Rå
Rå
Line/Line Ú
(MÉ)
Line/NeutralÚ Line/EarthÚ
(MÉ) (MÉ)
at IÜ
(ms)
at 5IÜ (if applicable)
(ms)
Test button operation
(á)
1
0.18
1
1
1
á
0.26
2
0.41
1
1
1
á
0.49
3
0.30
1
1
1
á
0.38
4
1
1
1
5
0.27
0.4
0.4
0.4
á
0.35
6
0.04
1
1
1
á
0.12
7
0.25
1
1
1
á
0.33
á
8
9
10
*Note: Wheretheinstallationcanbesuppliedbymorethanonesource,suchasprimarysource(egpublicsupply)andasecondarysource(egstandbygenerator),thehigherorhighest values must be recorded.
TESTED BY
This form is based on the model shown in Appendix 6 of BS7671
Published by the NICEIC a part of the Ascertiva Group © Copyright The Electrical Safety Council (July 2011)
Page 8 of 8
N BROOKS
This report is not valid if the serial number has been defaced or altered
IPN3/0385688
Signature:
Name: (CAPITALS)
Position:
Date of testing:
PDH
16/03/2013
See previous page for Schedule of Circuit Details
Circuit number and phase
Original (To the person ordering the work)


































































































   906   907   908   909   910