Page 19 - OmniBeaconUserGuide_GDVersion
P. 19
(1) Using the base foam gasket as a drilling template, mark hole locations in 5 places. Drill or punch four 3/16” holes and one 3/4” hole.
(2) Place the gasket on a mounting surface and line up four 3/16” holes for the #8 machine screws.
(3) Remove the 3⁄4” conduit nut from the chase nipple. It will be secured in step (7).
(4) Pass the OmniBeacon wires and chase nipple through the 3⁄4” hole. Line up four 3/16” holes with the mounting feet.
(5) Locate the four 8-32 Stainless Steel machine screws and four #8 Neoprene Sealing Washers.
(6) Insert the 8-32 Stainless Steel machine screws into the #8 Neoprene Sealing Washers, and then insert this into the four base feet. Attach the four 8-32 Stainless Steel nuts from the underside. Tighten the nuts snuggly.
(7) Feed wires through the 3⁄4” conduit nut and tighten to chase nipple.
(8) Refer to Electrical Connections section for wiring details.
19

