Page 124 - Achievement Report 2012-2016 Northern Regional Office eBook
P. 124
List of Projects Implemented in 2016
No. Project Description Contractor Contract Sum
1 The proposed Long Lama Bridge Over Batang Baram, Miri Division, Sarawak. Pekerjaan Piasau Konkerit Sdn Bhd 67,109,453.37
PWD/HO/B001/2016 Tender No : T/T25/11/2105
2 Design and build and negotiated Contract proposed upgrading of Jalan Pekerjaan Piasau Konkerit Sdn Bhd 42,806,818.69
Tudan, Miri Division. PWD/HO/B006/2016
3 Design and build and negotiated Jalan Akses ke "Integrated Highland Rizqry Engineering 5,328,179.74
Agriculure Development Area" Long Peluan/Long Banga-Ulu Baram,
Bahagian Miri. PWD/HO/B017/2016
4 Contruction and Completion of the Bekalan Air Samalaju, Bahagian Bintulu, Mainline Enterprise Sdn. Bhd. 3,672,900.00
Sarawak: Phase 1 Package 3C: Proposed Weir, Barracks and Associated
Facilities at Similaju Raw Water Intake. PWD/HO/B019/2016
5 Retender: RTP - Construction and Completion of the proposed upgrading to Irama Megah Sdn Bhd 904,959.33
R.C. Jetty at Kampung Punang, Lawas District, Limbang Division.
PWD/HO/B025/2016
6 Proposed Contruction and Completion of Masjid Baru Kpg. Pemukat Lawas, Hanslink Construction Sdn Bhd 1,395,036.32
Bahagian Limbang, PWD/HO/B029/2016
7 Sandfilling and Associated Works to proposed Masjid Terapung Kampung Cergas Asli Sdn Bhd 960,731.00
Punang, Lawas, Limbang Division. PWD/HO/B034/2016
8 The fabrication of various high intensity prismatic grade reflective traffic signs Asarajaya Sdn Bhd 795,318.00
and the construction and installation of traffic sign along Long Lopeng
Bekalan Road (Jiwa Murni Project) Lawas District, Limbang Division.
PWD/HO/B052/2016
120 Achievement Report 2012 - 2016
Northern Regional Office Jabatan Kerja Raya Sarawak