Page 692 - Area X - G
P. 692

8 2 Extension Program
 Conduct training needs   Submission of TNA report on set   TIMELINESS5 - Submits report 3
 assessment  schedule  days or more before the due date

 4 - within 1-2 days before the due
 date 3 -  on due date
 2 - within  1-2 days after the due

 date
 1- within 3 or more days after

 due date
 Package information and   Packaging and reproduction of   QUANTITY
 technologies  information and technology on set
 schedule  5- Achieved 130% of set target
 4-115-129%
 3-100-114%
 2 -51 %-99%
 1-50% and below

 TIMELINESS 5 - Package and or
 reproduce information and
 technology 3 days before set
 schedule
 4 - within 1-2 days before the due
 date 3 -  on due date
 2 -  within 1-2 days after the due
 date
 i - within13 or more days arret—
 due date
 Implement extension projects  Submission of project/ activity   QUANTITY
 proposals for extension on set   5- Achieved 130% of set target
 schedule  4-115-129%
 3-100-114%
 2 -51%-99%

 1-50% and below
 QUALITY5 - accepted by the
 Review Committee with no
 revision 4 -  accepted with minor
 revision 3 - deferred due to
 factors bevond the
 control of the proponent
    IF S U -H R D -P M T -F 0 3 2
     Rev 00 (F e b   04 ,2019)
   687   688   689   690   691   692   693   694   695   696   697