Is the zoning of the system adequate?                                                                              Describe the controls for the lighting system:
        N/A                                                                                                                N/A
        Suggested Improvements:
        None                                                                                                               Does available lighting provide adequate security:
                                                                                                                           N/A

        F. Drainage                                                                                                        Suggested Improvements:

                                                                                                                           N/A
        Is Drainage formalized and visible?

        Soccer
        • There is a drainage swale around the perimeter of the field with catch basins at the                             H. Fencing
        northwest and southwest corners                                                                                    Describe type and condition of fencing:
        •The catch basins are approximately 5’ above grade and have a small hole at grade with the
        base of the swale to collect run off. Catch basins are designed for infiltration of storm water                    • No fencing on field                                                                                        SECTION 3 - EXISTING CONDITIONS & ANALYSIS

        through the swale with a small hole at the bottom that chokes the flow of water and an over                        • Guardrail along east side of site along slope down to the road
        flow at the top for larger rain events
        Does it correlate with accepted industry practice and signatures?                                                  Suggested Improvements:


        •The drainage swale has been completely filled with sediment along the east side of the field                      • Possible guardrail along swale which extends along parking lot.
        such that it is flush with the field along the steep hill. During the rain event, as stormwater


        drained down the hill it caused erosion on the hill and carried significant amounts of sediment
        onto the field.

        F. Electrical

        Is electrical service adequate for the loads on-site?


        N/A
        Are there any safety or reliability issues with the electrical service?


        No

        G. Field Lighting

        Is lighting available?                                                                                                                                                                                                          -KALLANDER FIELD

        • No

        Describe type, make, model, age:

        N/A


        Is lighting coverage adequate for the field?

        N/A