Page 53 - Southborough Final Package
P. 53
Is the zoning of the system adequate? Describe the controls for the lighting system:
N/A N/A
Suggested Improvements:
• None Does available lighting provide adequate security:
N/A
F. Drainage Suggested Improvements:
N/A
Is Drainage formalized and visible?
Soccer/Baseball
•No drainage in field H. Fencing
•Significant ponding on field/walkway Describe type and condition of fencing:
•Drainage pipe outlet at the northeast corner of the site is causing erosion
Does it correlate with accepted industry practice and signatures? • Galvanized 4’ chain link fence around the west and north SECTION 3 - EXISTING CONDITIONS & ANALYSIS
• Black vinyl 4’ chain link fence around youth playground
• No • Metal guardrail on east side along Central Rd with pedestrian entrance from road and
south side along Winter St.
• Retained wall along slope on east side
F. Electrical
Is electrical service adequate for the loads on-site? Suggested Improvements:
• No • Replace backstop for baseball field is undersized at approximately 12’.
Are there any safety or reliability issues with the electrical service? • Playground and basketball court on site is scheduled to be redesigned
• Stone dust path around field to be paved
• No
G. Field Lighting
Is lighting available?
• None
Describe type, make, model, age:
N/A
Is lighting coverage adequate for the field?
N/A -HAROLD E. FAY MEMORIAL
SOUTHBOROUGH ATHLETIC MASTER PLAN
53