Page 53 - Southborough Final Package
P. 53

Is the zoning of the system adequate?                                                                              Describe the controls for the lighting system:
        N/A                                                                                                                N/A
        Suggested Improvements:
        • None                                                                                                             Does available lighting provide adequate security:
                                                                                                                           N/A

        F. Drainage                                                                                                        Suggested Improvements:

                                                                                                                           N/A
        Is Drainage formalized and visible?

        Soccer/Baseball
        •No drainage in field                                                                                              H. Fencing
        •Significant ponding on field/walkway                                                                              Describe type and condition of fencing:

        •Drainage pipe outlet at the northeast corner of the site is causing erosion

        Does it correlate with accepted industry practice and signatures?                                                  • Galvanized 4’ chain link fence around the west and north                                                   SECTION 3 - EXISTING CONDITIONS & ANALYSIS
                                                                                                                           • Black vinyl 4’ chain link fence around youth playground
        • No                                                                                                               • Metal guardrail on east side along Central Rd with pedestrian entrance from road and
                                                                                                                              south side along Winter St.

                                                                                                                           • Retained wall along slope on east side
        F. Electrical

        Is electrical service adequate for the loads on-site?                                                              Suggested Improvements:

        • No                                                                                                               • Replace backstop for baseball field is undersized at approximately 12’.

        Are there any safety or reliability issues with the electrical service?                                            • Playground and basketball court on site is scheduled to be redesigned
                                                                                                                           • Stone dust path around field to be paved
        • No
        G. Field Lighting


        Is lighting available?

        • None

        Describe type, make, model, age:

        N/A


        Is lighting coverage adequate for the field?
        N/A                                                                                                                                                                                                                             -HAROLD E. FAY MEMORIAL











        SOUTHBOROUGH ATHLETIC MASTER PLAN




                                                                                                                                                                                                                                    53
   48   49   50   51   52   53   54   55   56   57   58