Page 178 - Area_V_Parameter_C
P. 178
CvSU MANUAL OF OPERATIONS
302
Specific management of the experiment (this include specific
features about the management of the experiment that are not
included in the treatments)
Cultural practices (i.e. land preparations, pest control, weed
control, fertilization, etc.)
E. REVIEW OF RELATED LITERATURE
This contains a thorough review of existing literature on problems
of similar nature. It provides concepts and approaches to the proposal. It
also identifies gaps in existing knowledge, helps determine whether the
proposed study is in the proper direction or not and eliminates the
possibility of duplication.
F. BUDGETARY REQUIREMENTS
The budget requirements include the following:
Personal Services (PS) – total requirement for wages, honoraria,
additional hire and other personal benefits
Maintenance and Other Operating Expenses (MOOE) – total
requirements for supplies and materials, travel expenses,
communication and other services.
Capital Outlay (CO) – total requirement for facilities and equipment
needed by the project.
G. WORKPLAN
A tabular matching of objectives per study, expected outputs
per objective, and activities per output organized in Gantt Chart. Each
activity for an expected output is viewed against time for its conduct and
completion (see attached form).
H. LITERATURE CITED
This includes the list of papers cited in the proposal to serve
as reference for the reviewer. It must be arranged alphabetically by author
and year following the standard format.
302