                         1  Specify the Rebar used in the major   •  Rebar size - Define the rebar size in
                            foundation components: Footing, Wall   1/8th inches. 4 represents 4/8, or ½ inch.
                        Horizontal courses, Wall Vertical courses,   •  Specify the Overlap where sticks of
                        Pier, and Slab. Rebar is calculated in the   rebar meet, in terms of the rebar’s Diam-
                        Materials List but does not display in any 2D   eter. A value of 40.0, for example, equals
                        or 3D views of the model. See “The         40 times the Rebar Size.
                        Materials List Tools” on page 1264.
                                                                •  Check Use Mesh to reinforce the slab
                        •  Bars per Course - Specify the number of   floor with mesh instead of rebar, or
                           bars of rebar to be used per course for   uncheck it to use rebar.
                           each foundation component.
                        •  Course Spacing - Define the spacing for   2  Foundation Options - Select either
                                                                    Foam Seal, Termite Flashing, or both.
                           Vertical and Horizontal Wall courses, and   These options are added to the Materials
                           for Slabs. If slabs are to have rebar   List, but do not display in the model.
                           instead of mesh, this spacing value
                           applies to both directions.


                   Building a Foundation

                             Foundations can be generated       •  Any interior walls on Floor 1 that have
                             automatically or drawn manually. A    Create Wall/Footing Below checked in
                        combination of the two methods can also be   the Wall Specification dialog. See
                        used.                                      “Foundation Panel” on page 398.
                        Three foundation types are available: stem   At least one room must be defined on Floor 1
                        walls with footings, grade beams on piers,   for a foundation to be automatically
                        and monolithic slabs. The first two options   generated. If no rooms are defined on Floor
                        are created using walls; the last creates   1, a blank Floor 0 is created.
                        concrete slabs with footings.
                                                                There can be only one Floor 0 per plan. If
                        Automatically built foundations are placed   your plan requires a foundation on more than
                        on Floor 0 and are based on wall positions   one floor, you will need to draw the required
                        and floor heights on Floor 1. Foundation   foundation walls or slabs yourself.
                        walls or slab footings are generated under:
                        •  All exterior walls on Floor 1 that define a   To build an automatic foundation
                           room other than a Court, Deck or Bal-
                           cony room type. See “Room Definition”   1.  Select Build> Floor> Build Founda-
                           on page 411.                            tion   .
                        •  Any interior walls on Floor 1 defining   2.  Specify the desired foundation type and
                           rooms with different floor heights. See   other information in the Build
                           “Floor and Ceiling Heights” on page 425.   Foundation dialog. The settings in this




                   692
   687   688   689   690   691   692   693   694   695   696   697