NETWORK PROJECT FOR AXIOM TELECOM, JLT DUBAI 7 BACKBONE GBIC LINK FROM 13TH FLOOR TO 20TH FLOOR, CONNECTING 2 OFFICES WITH STRENGTH OF MORE THAN 500 EMPLOYEES WITH HEAVY DATA FLOW INCLUDES STRUCTURED CABLING WITH BACK BONE CONNECTIVITY.