AFCO AIR CARGO
FACILITY BWI BUILDING H
10TH & O STREET
CAPITOL ANNEX
LOCATION: Baltimore, MD
CLIENT: Maryland Aviation Administration
GENERAL CONTRACTOR: Haskell Company SWING SPACE
BUDGET: $5.7M PROJECT PROFILES
This project was complex due to its compressed schedule
and large scope. During the course of the project, the
owner determined that the needs were greater than
anticipated and increased the scope of work. Rosendin
employed 80 field employees on the job, doubling
the average number of employees on-site, in order
to complete this project on time with the increased LOCATION: Sacramento, CA
scope. This made it a large task to control the safety
while work continued 14-16 hours a day, 7 days a week CLIENT: State of California Department of General Services
for 2 months. In the last month of the project, a roller GENERAL CONTRACTOR: Hensel Phelps Construction
floor was scheduled for installation to assist in moving BUDGET: $52 Million
packages once the facility was open. Rosendin completed
all of the high work prior to the floor installation as lifts The 10th and O Street Capital Annex Swing Space will temporarily house approximately 1,250
and ladders would not be usable after the floor was legislative and executive elected officials and staff from the Capitol Annex until the new Annex project is
installed. The team used many prefabricated systems for completed. The building will then be jointly used as office space for legislative and executive employees.
lighting to increase efficiencies of scheduled electrical The 10-story building is approximately 472,600 gross square feet and includes function space for committee
activities. Additionally, Rosendin had the lighting vendor hearings, caucus meetings, general meeting rooms, and legislative and Executive Branch offices, as well as
provide all of the light fixture whips with the fixtures. parking. The project is being designed to be one of the most sustainable state office buildings to house
This project was completed on time and under budget. elected officials in the country, with the goal of LEED Gold. To meet that certification level, the building will
feature low water use fixtures, a high-performance building facade, materials with high recycled content, day-
lighting, native vegetation on the surrounding site and terraces, as well as LED lighting throughout. Upon
CHARLOTTE DOUGLAS LOCATION: Charlotte, NC completion, the 10th & O Street building will be Zero Net Carbon and will also achieve Zero Net Energy
through energy efficiency and off-site power generation.
CLIENT: City of Charlotte
INTERNATIONAL AIRPORT GENERAL CONTRACTOR: Messer Construction
BUDGET: $2.7 Million
Destination CLT is a multi-billion dollar investment PROJECT WILDCAT
program to renovate and expand the Charlotte LOCATION: Charlotte, NC
Douglas International Airport. To date, Rosendin CLIENT: Lincoln Harris
has provided electrical contractor services for
three separate phases of the Destination CLT GENERAL CONTRACTOR: Gilbane
initiative; Concourse A expansion and renovation Building Company
and Concourse B renovation. The improvements to BUDGET: $10 Million
the airport have included nine gates, high ceilings,
natural light, terrazzo flooring and sustainable, Project Wildcat is a 688,312 square foot,
high-tech windows. New traveler amenities include twenty-four-floor core & shell project
seating with wireless charging armrests and local that will soon become the new home
craft beer; other key upgrades involve heating and of Honeywell Corporation in Uptown
air conditioning systems, electrical, fire alarm and Charlotte. Honeywell will occupy 10
sprinkler systems. The restrooms received new floors of the building, with the remaining
sinks, touchless faucets, and soap dispensers as well floors including ground-floor retail, a
as counters, mirrors and tile finishes. A new Flight lobby, and an 800-space parking garage.
Information Display System was installed in addition The building is located directly across the
to a new user-friendly Wi-Fi system. When all of street from Bank of America Stadium and
the renovations are completed, Charlotte Douglas covers two city blocks.
International Airport will be transformed into a
bright, innovative, customer-focused destination.