Page 10 - ProfilGate-Loc8
P. 10
Above-ground Above-ground Driveway + entrance Entrance to Driveway to Continuous Entrance
installation as installation with into the clean hall ESD before ESD / air cleaning to workshop
test field epoxy-resin ProfilGate® b65 go econductivity test curtain ProfilGate® ProfilGate® st55
ProfilGate® b55 ramps ProfilGate® b65 ProfilGate® ProfilGate® st55
ProfilGate® b55 st55 go st55
Integrated into Space-saving under Cleaning AGV For soles and Continuous Integrated into
loading docks the canopy in front between logistics smaller rollers cleaning of AGV the air lock
ProfilGate® st55 of the entrance to the and assembly ProfilGate® k55 in clean zones in front to the
logistics department ProfilGate® st65 ProfilGate® st55 inner door
ProfilGate® b65 ProfilGate® b65
10