Page 17 - COMPANY PROFILE
P. 17
Designing, installation, Erection and commissioning of Power House in Panther
tyresPvt Ltd.
Designing, installation, Erection and commissioning of Atlas Copco Compressors
in Utility department in Panther tyresPvt Ltd.
GENERAL TYRES PVT LTD
Complete installation, Erection, Commissioning of Rubbers Mixers F270 in mixing
department in General Tyre.
Installation of Curing presses in New Tractor line in General Tyre.
Installation of uniformity machine for radial tyre testing in General tyre.
Modification in hot water control system from pneumatic to Electronic system in
General Tyre.
PAKISTAN STELL MILLS, KARACHI
Maintained all types of interlocking and signaling system in Pakistan steel mills
ENGRO AND BOC GAS
Shutdown of Engro Asahi &EngroZerkhez. Calibration of field instruments and
final control devices. I. E. pressure gauges. Transmitters, flow meters, control
valves, P.R.V, I/P converters and SOV.
Completed shutdown of BOC gas testing & calibration of field instruments
connected with PLC & DCS in CCR.
CATERPILLAR GAS GENERATORS PANELS
Worked on safety panel of gas generators (CATERPILLAR) of TERBERG PLC &
TOUCH SCREEN (HMI) system in commissioning at different sites i.e. textile, glass
industries, and pharmaceuticals
UNIVERSAL CABLES AND PAKISTAN CABLES
Installation & programming of A.C. SERVO DRIVE (Panasonic) & BUNCHER
machine automation with PLC (LG). Also work on temperature control system
with Honeywell control.
PAKLAND CEMENT & ESSA CEMENT
Calibration, testing and commissioning of smart instruments & work in CCR on
PLC. Also programming of SMART level loop.
PAK AMERICAN FERTILIZER