Page 22 - IWCC Athletic Complex Master Plan 2021
P. 22

TRACK






      Track



      The track will be completely rebuilt.
      The existing track will be removed,
      and a completely new asphalt base
      will be constructed with the new
      synthetic track surfacing. The infield
      will feature synthetic turf as well,
      that could be used as practice field
      and warm up areas for the athletes.
      The track will also be designed to
      accommodate an automatic timing
      system.