Page 22 - IWCC Athletic Complex Master Plan 2021
P. 22
TRACK
Track
The track will be completely rebuilt.
The existing track will be removed,
and a completely new asphalt base
will be constructed with the new
synthetic track surfacing. The infield
will feature synthetic turf as well,
that could be used as practice field
and warm up areas for the athletes.
The track will also be designed to
accommodate an automatic timing
system.
21 - Iowa Western Athletic Complex Master Plan