Designing a a a a power supply system for for a a a a substation for for a a a a winery
EEE-5-6
By: Ron Ron Ashush Ronashoosh284@gmail com Advisor: Ms Vered Litvak Shamoon College of Engineering Beer-Sheva
This project involves the the the the the designing of of a a a a a a a power supply system for a a a a a a a winery
winery
substation in in in in in in in in accordance with the the the the the requirements of of of of of the the the the the winery
winery
engineer Also during the the the the the planning planning stages the the the the the principles of of of of electrical planning planning were considered: reliability of of of of supply quality of of of of electricity and techno-economic aspects It turned out that the the substation is is more efficient for a a a a a a a a a a a a a a a a a a a a a winery
in in in in in an an an an an an an internal configuration rather than an an an an an an an external one because of of its long resistance resistance to to wear and and tear and and resistance resistance to to to the the the the elements This option was was considered at at at at the the the the beginning of of of the the the the project but was was not carried out due to to techno-economic considerations of of erecting a a a a a a a a a a a a a structure Keywords: electrical panel electricity financial substation supplies winery
Electrical and control network planning for the "Rinkam" facility
EEE-5-7
By: Idan Yosibashvily idanyo231@gmail com Advisor: Mr Yosef Rahmin Shamoon College of Engineering Beer-Sheva
The The Rinkam facility
is based on on temperature-controlled storage and and transport of of chemicals and and gases which are are sensitive to to changes in in temperature temperature Therefore reliability of of the electricity supply safety and energy efficiency are are required The The system has low-voltage panels that feed 120 controlled containers in in in in the the field An "Oil" type transformer with a a a a a a a a a a a a a a a a a a a a a capacity of 1600 [KVA] was was chosen for for the the the the heating system a a a a a a a a a a a a a a a a a a a a main main low-voltage panel panel panel panel was was designed so that each circuit breaker in in in in in in in in in in in the the the main main panel panel panel panel feeds a a a a a a a a a a a a a a a a a a a a a a panel panel panel panel in in in in in in in in in in in the the the field This project includes sketching panels in in in in in in in in in in in AutoCAD lighting planning planning in in in in in in in in in in Relux and and a a a a a a a a a a a a a a high-quality and and reliable literature survey Keywords: control system electricity planning planning network equipment