Page 187 - Facilities Master Plan 2016
P. 187

•  New window treatments are needed
                                                                                                        •  The staff restrooms in the main office
                                                                                                           need to be remodeled
                                                                                                        •  Office intercom is needed
                                                                                                        •  A new bell system is needed
                                                                                                        •  Wrought iron fencing at the front of the
                                                                                                           school needs to be replaced
                                                                                                        •  Security cameras are needed at the rear
                                                                                                           of campus
                                                                                                        •  The front office needs to be repainted
                                                                                                        •  The front landscaping needs to be
                                                                                                           redone
                                                                                                        •  An electronic marquee is desired
                                                                                                        •  Pass keys for every door are desired
                                                                                                        •  A new trophy case is desired
                                                                                                        •  Additional shade is needed
                                                                                                        •  A stage is needed at the MPR
                                                                                                        •  HVAC needs to be replaced in Rooms
                                                                                                           5,6, and 8


        2515 Estate Drive, Stockton, CA 95209                                                           Notes from Maintenance & Operations:

        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT                           •  Replace all portable ramps/stairs
                                                                                                        •  Interior and exterior painting and flooring
        Year Built: 1985                                 Recently Completed Work:                       •  Common areas (restrooms, libraries,
        Site Acreage: 11 acres                                                                             etc.) need specialized access control
                                                         •  N/A                                         •  More custodian storage
        Student Population (2014-2015): 555                                                             •  Dumpster enclosures for 4 dumpsters
        Grade Levels: K-6                                                                               •  New emergency lighting battery backup
                                                         Notes/Comments from School Site:                  system
        Total Number of Classrooms: 22                                                                  •  Replace HVAC units at 15 portables
        Number of Portables: 19                          •  Consolidate alarm pads in one central       •  Replace gas service line and 2 water
                                                            location                                       heaters in kitchen
                                                         •  Replace the laminate in all classrooms, offices   •  Portables may need siding repaired
                                                            and the library                             •  Replace all locksets and closers
                                                         •  Interior paint is needed in all classrooms  •  Recaulk windows
                                                         •  All doors need to be painted                •  Re-roof 3 portables


        5.24       EXISTING CONDITIONS ASSESSMENT                                                                              Facilities Master Plan  188
                   CREEKSIDE ES                                                                                            Lodi Unified School District
   182   183   184   185   186   187   188   189   190   191   192