Page 239 - Facilities Master Plan 2016
P. 239
Notes/Comments from School Site:
• Additional classrooms are needed
• Need a music classroom and a All images taken by LPA.
computer lab
• Parking lots and hardcourts need to be
repaved
• Improved campus access is needed;
possibly connect to Armstrong
• Move Rooms 15-17 to the north, away
from tree roots and leaves
• Animals get under the portables
• Campus is on a well and septic system
Notes from Maintenance & Operations:
• Replace all portable ramps/stairs
• Interior and exterior painting and flooring
• Common areas (restrooms, libraries,
etc.) need specialized access control
5099 Bear Creek Road, Lodi, CA 95240 • More custodian storage
• Dumpster enclosures for 4 dumpsters
EXISTING SITE INFORMATION CONDITION ASSESSMENT • Replace all HVAC units
• Replace EMS
Year Built: 1949 Recently Completed Work: • Replace water main and all plumbing
Site Acreage: 6.72 acres fixtures
• Roof was replaced • Portables may need siding repaired
Student Population (2014-2015): 320 • Windows were replaced • Replace 80% of door hardware
Grade Levels: K-6 • Carpet was replaced • Re-roof portables
• Asbestos tiles removed • Needs asphalt overlay at parking and
Total Number of Classrooms: 18 • MPR restrooms were upgraded playgrounds
Number of Portables: 8 • HVAC at Administration was upgraded • Remove 6 trees
• T-8 lighting was upgraded • Level field
• MPR was renovated • Runs off a well
• Needs irrigation automation and booster
pump
5.33 EXISTING CONDITIONS ASSESSMENT Facilities Master Plan 237
LIVE OAK ES Lodi Unified School District