Page 278 - Facilities Master Plan 2016
P. 278

needed
                                                                                                        •  A secure point of entry to control people
                                                                                                            arriving is needed
                                                                                                        •  New HVAC is needed                        All images taken by LPA.
                                                                                                        •  The school is outdated and needs curb
                                                                                                            appeal
                                                                                                        •  Restrooms need to be updated
                                                                                                        •  Space for academic coaches is needed
                                                                                                        •  Need additional administrative space
                                                                                                        •  Need window coverings


                                                                                                        Notes from Maintenance & Operations:


                                                                                                        •  Replace all portable ramps/stairs
                                                                                                        •  Interior and exterior painting and flooring
                                                                                                        •  Common areas (restrooms, libraries,
                                                                                                            etc.) need specialized access control
                                                                                                        •  More custodian storage
                                                                                                        •  Dumpster enclosures for 4 dumpsters
                                                                                                        •  Replace HVAC unit at MPR
        1301 S. Crescent Avenue, Lodi, CA 95240                                                         •  Replace water main
                                                                                                        •  Replace gas lines
        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT                           •  Portables may need siding repaired
                                                                                                        •  Covered walk wood columns need to be
        Year Built: 1956                                 Recently Completed Work:                           replaced
        Site Acreage: 10 acres                                                                          •  Replace 90% of door hardware
                                                         •  Carpet / paint in Room 9                    •  Replace all windows
        Student Population (2014-2015): 400              •  Hall was painted                            •  Replace perimeter chainlink fence
        Grade Levels: K-6                                •  Smartboards were installed                  •  Re-roof portables
                                                                                                        •  Needs asphalt overlay at parking and
        Total Number of Classrooms: 23                                                                      playgrounds
        Number of Portables: 5                           Notes/Comments from School Site:               •  Need new mop sinks
                                                                                                        •  Remove 12 trees
                                                         •  A  larger cafeteria w/ new tables is needed  •  Level field
                                                         •  Better circulation in the kitchen (flows    •  Needs irrigation automation, some
                                                            inefficiently)                                  piping replacement and new booster
                                                         •  Security fencing and an all-call system are     pump


        5.39       EXISTING CONDITIONS ASSESSMENT                                                                              Facilities Master Plan  273
                   LEROY NICHOLS ES                                                                                        Lodi Unified School District
   273   274   275   276   277   278   279   280   281   282   283