Page 284 - Facilities Master Plan 2016
P. 284
baseball field can be removed if
necessary)
• Green play space is needed
• Additional parking is needed along with All images taken by LPA.
designation for staff and visitor stalls
Notes from Maintenance & Operations:
• Replace all portable ramps/stairs
• Interior and exterior painting and flooring
• Common areas (restrooms, libraries,
etc.) need specialized access control
• More custodian storage
• Dumpster enclosures for 4 dumpsters
• Replace rooftop HVAC units
• Replace EMS
• Replace restroom fixtures and remodel
portable restrooms
• Portables may need siding repaired
• Replace 40% of door hardware
1315 Woodcreek Way, Stockton, CA 95209 • Re-roof 3 portables
• Needs asphalt overlay at parking and
EXISTING SITE INFORMATION CONDITION ASSESSMENT playgrounds
• Remove 8 trees
Year Built: 1977 Recently Completed Work: • Needs irrigation automation
Site Acreage: 8 acres
• N/A
Student Population (2014-2015): 500
Grade Levels: K-6
Notes/Comments from School Site:
Total Number of Classrooms: 34
Number of Portables: 15 • Access gate near administration needs to be
relocated so that students don’t have to leave
the secure campus to access the office
• Administration building needs to be
modernized
• A track and open field are desired (existing
5.40 EXISTING CONDITIONS ASSESSMENT Facilities Master Plan 279
OAKWOOD ES Lodi Unified School District