Page 305 - Facilities Master Plan 2016
P. 305

at the entry
                                                                                                        •  Air conditioning at staff lounge is needed
                                                                                                        •  A separate staff workroom (not shared
                                                                                                           with the lounge)                          All images taken by LPA.
                                                                                                        •  A larger Vice Principal office is needed
                                                                                                        •  Water and restrooms are needed in the
                                                                                                           kindergarten portable
                                                                                                        •  Kids accessing the roof needs to be
                                                                                                           addressed
                                                                                                        •  Replace portables with permanent
                                                                                                           buildings


                                                                                                        Notes from Maintenance & Operations:

                                                                                                        •  Replace all portable ramps/stairs
                                                                                                        •  Interior and exterior painting and flooring
                                                                                                        •  Common areas (restrooms, libraries,
                                                                                                           etc.) need specialized access control
                                                                                                        •  More custodian storage
                                                                                                        •  Dumpster enclosures for 4 dumpsters
        1800 West Elm Street, Lodi, CA 95242                                                            •  Replace rooftop HVAC unit
                                                                                                        •  Replace EMS
        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT                           •  Replace gas lines and water main valves
                                                                                                        •  Portables may need siding repaired
        Year Built: 1957                                 Recently Completed Work:                       •  Fascia needs to be repaired at
        Site Acreage: 9.18 acres                                                                           permanent buildings
                                                         •  Mold was removed from 20+ rooms about 1.5   •  Replace all door hardware
        Student Population (2014-2015): 615                 years ago                                   •  Replace all windows
        Grade Levels: K-6                                •  Drop-off/pick-up area in the parking lot was   •  Replace 75% of perimeter chainlink
                                                            widened                                        fence
        Total Number of Classrooms: 29                                                                  •  Re-roof portables
        Number of Portables: 14                                                                         •  Needs asphalt overlay at parking and
                                                         Notes/Comments from School Site:                  playgrounds
                                                                                                        •  Replace 6 trees
                                                         •  Additional classrooms are needed            •  Needs irrigation automation, all piping
                                                         •  A larger cafeteria with a stage is needed      replaced and new booster pump
                                                         •  Expand administration and improve security


        5.43       EXISTING CONDITIONS ASSESSMENT                                                                              Facilities Master Plan  297
                   ERMA B. REESE ES                                                                                        Lodi Unified School District
   300   301   302   303   304   305   306   307   308   309   310