at the entry
• Air conditioning at staff lounge is needed
• A separate staff workroom (not shared
with the lounge) All images taken by LPA.
• A larger Vice Principal office is needed
• Water and restrooms are needed in the
kindergarten portable
• Kids accessing the roof needs to be
addressed
• Replace portables with permanent
buildings
Notes from Maintenance & Operations:
• Replace all portable ramps/stairs
• Interior and exterior painting and flooring
• Common areas (restrooms, libraries,
etc.) need specialized access control
• More custodian storage
• Dumpster enclosures for 4 dumpsters
1800 West Elm Street, Lodi, CA 95242 • Replace rooftop HVAC unit
• Replace EMS
EXISTING SITE INFORMATION CONDITION ASSESSMENT • Replace gas lines and water main valves
• Portables may need siding repaired
Year Built: 1957 Recently Completed Work: • Fascia needs to be repaired at
Site Acreage: 9.18 acres permanent buildings
• Mold was removed from 20+ rooms about 1.5 • Replace all door hardware
Student Population (2014-2015): 615 years ago • Replace all windows
Grade Levels: K-6 • Drop-off/pick-up area in the parking lot was • Replace 75% of perimeter chainlink
widened fence
Total Number of Classrooms: 29 • Re-roof portables
Number of Portables: 14 • Needs asphalt overlay at parking and
Notes/Comments from School Site: playgrounds
• Replace 6 trees
• Additional classrooms are needed • Needs irrigation automation, all piping
• A larger cafeteria with a stage is needed replaced and new booster pump
• Expand administration and improve security
5.43 EXISTING CONDITIONS ASSESSMENT Facilities Master Plan 297
ERMA B. REESE ES Lodi Unified School District