Page 311 - Facilities Master Plan 2016
P. 311

Notes/Comments from School Site:


                                                                                                        •  New VCT flooring is needed on the first
                                                                                                            floor                                    All images taken by LPA.
                                                                                                        •  Moisture infiltration in the walls needs
                                                                                                            to be addressed (hallway tiles and
                                                                                                            classroom partitions are shifting)
                                                                                                        •  A permanent stage is needed
                                                                                                        •  Portable classrooms C8 and C9 need to
                                                                                                            be replaced
                                                                                                        •  An electronic marquee is desired


                                                                                                        Notes from Maintenance & Operations:

                                                                                                        •  Common areas (restrooms, libraries,
                                                                                                            etc.) need specialized access control
                                                                                                        •  More custodian storage
                                                                                                        •  Dumpster enclosures for 4 dumpsters
                                                                                                        •  Portables may need siding repaired

        6250 Scott Creek Drive, Stockton, CA 95219

        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT

        Year Built: 2005                                 Recently Completed Work:
        Site Acreage: 11.2 acres
                                                         •  The exterior was painted in 2013
        Student Population (2014-2015): 851              •  Upgraded access points in each classroom
        Grade Levels: K-6                                   for WiFi
                                                         •  A new wall was added to divide the computer
        Total Number of Classrooms: 35                      lab into a computer lab and an RSP space
        Number of Portables: 2                           •  Irrigation lines were repaired
                                                         •  The hardcourts will be resurfaced during
                                                            Summer 2016







        5.44       EXISTING CONDITIONS ASSESSMENT                                                                              Facilities Master Plan  303
                   MANLIO SILVA ES                                                                                         Lodi Unified School District