Page 317 - Facilities Master Plan 2016
P. 317

Notes from Maintenance & Operations:


                                                                                                        •  Interior and exterior painting and flooring
                                                                                                        •  Common areas (restrooms, libraries,       All images taken by LPA.
                                                                                                            etc.) need specialized access control
                                                                                                        •  More custodian storage
                                                                                                        •  Dumpster enclosures for 4 dumpsters
                                                                                                        •  New emergency lighting battery backup
                                                                                                            system
                                                                                                        •  Replace HVAC at 8 portables
                                                                                                        •  Replace water heater and gas lines
                                                                                                        •  Portables may need siding repaired
                                                                                                        •  Replace all door hardware
                                                                                                        •  Recaulk windows
                                                                                                        •  Replace 50% of perimeter chainlink
                                                                                                            fence
                                                                                                        •  Re-roof portables
                                                                                                        •  Need new mop sinks
                                                                                                        •  Remove 12 trees, provide 6 new trees


        550 Spring River Circle, Stockton, CA 95210

        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT

        Year Built: 1991                                 Recently Completed Work:
        Site Acreage: 9.9 acres
                                                         •  N/A
        Student Population (2014-2015): 370
        Grade Levels: K-6
                                                         Notes/Comment from School Site:
        Total Number of Classrooms: 24
        Number of Portables: 1                           •  Need site lighting from the midpoint of
                                                            campus moving east








        5.45       EXISTING CONDITIONS ASSESSMENT                                                                              Facilities Master Plan  309
                   SUTHERLAND ES                                                                                           Lodi Unified School District
   312   313   314   315   316   317   318   319   320   321   322