Page 338 - Facilities Master Plan 2016
P. 338
structures
• Picnic tables and benches for eating
outside are desired
• The tables need to be replaced in the All images taken by LPA.
cafeteria
• An AV system is desired in the cafeteria
Notes from Maintenance & Operations:
• Replace all portable ramps/stairs
• Interior and exterior painting and flooring
• Common areas (restrooms, libraries,
etc.) need specialized access control
• More custodian storage
• Dumpster enclosures for 4 dumpsters
• Replace lighting at MPR
• Replace HVAC units
• Replace gas lines
• Replace water main valves
• Portables may need siding repaired
8778 Brattle Place, Stockton, CA 95209 • Replace all door hardware
• Recaulk windows
EXISTING SITE INFORMATION CONDITION ASSESSMENT • Replace 50% of perimeter chainlink
fence
Year Built: 1990 Recently Completed Work: • Re-roof portables
Site Acreage: 12 acres
• N/A
Student Population (2014-2015): 550
Grade Levels: K-6
Notes/Comments from School Site:
Total Number of Classrooms: 28
Number of Portables: 3 • Better vehicular circulation through the
parking lot is needed (congestion is a
problem during drop-off/pick-up)
• A shade shelter at the kindergarten
playground is needed
• Replace bark with rubber matting at the play
5.48 EXISTING CONDITIONS ASSESSMENT Facilities Master Plan 327
WAGNER HOLT ES Lodi Unified School District