Page 344 - Facilities Master Plan 2016
P. 344

and South DCH room
                                                                                                        •  A new projection screen, projector, and
                                                                                                           furniture are needed in the South DCH
                                                                                                           conference room                           All images taken by LPA.
                                                                                                        •  Restroom flooring needs to be replaced
                                                                                                        •  Toilet partitions need to be replaced
                                                                                                        •  Fencing at DCH needs to be replaced
                                                                                                        •  Additional power and data are needed
                                                                                                        •  Replace classroom shelving
                                                                                                        •  Updated furniture is needed
                                                                                                        •  The interior needs to be painted
                                                                                                        •  Replace portables with permanent
                                                                                                           classrooms
                                                                                                        •  Replace old doors
                                                                                                        •  ADA upgrades are needed
                                                                                                        •  A larger Vice Principal office is needed

                                                                                                        Notes from Maintenance & Operations:

                                                                                                        •  Replace all portable ramps/stairs
                                                                                                        •  Interior and exterior painting and flooring
                                                                                                        •  Common areas (restrooms, libraries,
                                                                                                           etc.) need specialized access control
        831 W. Lockeford Street, Lodi, CA 95240                                                         •  More custodian storage
                                                                                                        •  Dumpster enclosures for 4 dumpsters
        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT                           •  New emergency lighting battery backup
                                                                                                           system
        Year Built: 1950                                 Recently Completed Work:                       •  Replace all HVAC units
        Site Acreage: 12 acres                                                                          •  Replace EMS
                                                         •  Newer flooring in most areas                •  Replace all plumbing fixtures and
        Student Population (2014-2015): 500              •  Small remodel to remove large safe             drinking fountains
                                                         •  New restroom at Room 13
        Grade Levels: K-6                                                                               •  Portables may need siding repaired
                                                         •  Roof was replaced                           •  Replace all door hardware
                                                                                                        •  Recaulk windows
        Total Number of Classrooms: 30                                                                  •  Replace perimeter chainlink fence
        Number of Portables: 10                          Notes/Comments from School Site:               •  Re-roof portables
                                                                                                        •  Needs asphalt overlay at parking and
                                                         •  Hallway lighting needs to be replaced          playgrounds
                                                         •  Energy efficient windows are needed         •  Remove 8 trees
                                                         •  New window coverings are needed             •  Needs irrigation automation and new
                                                         •  Hallway baseboards need to be replaced         booster pump
                                                         •  Carpet needs to be replaced at Rooms 2-5

        5.49       EXISTING CONDITIONS ASSESSMENT                                                                              Facilities Master Plan  333
                   GEORGE WASHINGTON ES                                                                                    Lodi Unified School District
   339   340   341   342   343   344   345   346   347   348   349