Page 350 - Facilities Master Plan 2016
P. 350

•  Lighting and security cameras are
                                                                                                            needed along the southern edge of the
                                                                                                            campus, adjacent to the creek/canal      All images taken by LPA.


                                                                                                        Notes from Maintenance & Operations:

                                                                                                        •  Replace all portable ramps/stairs
                                                                                                        •  Interior and exterior painting and flooring
                                                                                                        •  Common areas (restrooms, libraries,
                                                                                                            etc.) need specialized access control
                                                                                                        •  More custodian storage
                                                                                                        •  Dumpster enclosures for 4 dumpsters
                                                                                                        •  Upgrade EMS
                                                                                                        •  Replace gas line to MPR and 2 kitchen
                                                                                                            water heaters
                                                                                                        •  Portables may need siding repaired
                                                                                                        •  Replace all door hardware
                                                                                                        •  Recaulk windows
                                                                                                        •  Replace 50% of perimeter chainlink
                                                                                                            fence
        1305 E. Vine Street, Lodi, CA 95240                                                             •  Re-roof throughout
                                                                                                        •  Needs asphalt overlay at parking and
        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT                               playgrounds

        Year Built: 1991                                 Recently Completed Work:
        Site Acreage: 13 acres
                                                         •  Fencing
        Student Population (2014-2015): 600              •  Gates
        Grade Levels: K-6                                •  Exterior paint

        Total Number of Classrooms: 34
        Number of Portables: 3                           Notes/Comments from School Site:

                                                         •  Hardcourts and parking lots need to be
                                                            resurfaced
                                                         •  Shade structures for lunch and play areas are
                                                            needed


        5.50       EXISTING CONDITIONS ASSESSMENT                                                                              Facilities Master Plan  339
                   WESTWOOD ES                                                                                             Lodi Unified School District