Page 398 - Facilities Master Plan 2016
P. 398

replaced with concrete
                                                                                                        •  Exterior and interior paint are needed
                                                                                                        •  Additional exterior lighting is needed
                                                                                                        •  A new PA system is needed                 All images taken by LPA.
                                                                                                        •  The tennis courts need to be repaired
                                                                                                        •  A storage facility is needed
                                                                                                        •  The HVAC in the A Wing needs to be
                                                                                                           replaced
                                                                                                        •  A larger wrestling room is needed



                                                                                                        Notes from Maintenance & Operations:

                                                                                                        •  Relocate gas regulators from below
                                                                                                           grade to above grade
                                                                                                        •  Replace 6 water heaters
                                                                                                        •  Re-key, replace 20% of door hardware
                                                                                                        •  Recaulk windows
                                                                                                        •  Replace two pool heaters
                                                                                                        •  Remove 20 trees, provide 10 new trees
                                                                                                        •  Replace field with turf
        10555 Thornton Road, Stockton, CA 95209

        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT

        Year Built: 1991                                 Recently Completed Work:
        Site Acreage: 48.98 acres
                                                         •  New security cameras
        Student Population (2014-2015): 2,050            •  Photovoltaic (PV) panels were installed in
        Grade Levels: 9-12                                  2011
                                                         •  Re-roofed portables A23-31
        Total Number of Classrooms: 87
        Number of Portables: 14
                                                         Notes/Comments from School Site:

                                                         •  Fencing needs to be relocated at Buildings F
                                                            and K to protect the exterior doors
                                                         •  The grass between Units Q and N needs to be


        5.57       EXISTING CONDITIONS ASSESSMENT                                                                              Facilities Master Plan  381
                   BEAR CREEK HS                                                                                           Lodi Unified School District