Page 426 - Facilities Master Plan 2016
P. 426
• The tennis courts need to be redone
• High School standard backstops are
needed for baseball
• Currently have a joint-use agreement All images taken by LPA.
with the City of Stockton for four soccer
fields; condition of the fields is so poor
that they can’t be used
Notes from Maintenance & Operations:
• Upgrade lighting control panels
• Need to enclose fire pump system
• Replace water lines and extend hot water
to Arts/Crafts building
• Portables may need siding repaired
• Re-key, replace 20% of door hardware
• Replace filter pump with VFD
• Remove 20 trees, provide 10 new trees
• Provide shop building for mowers, etc.
• Redesign and replace irrigation system
9550 Ronald E. McNair Way, Stockton, CA 95210
EXISTING SITE INFORMATION CONDITION ASSESSMENT
Year Built: 2005 Recently Completed Work:
Site Acreage: 53.82 acres
• N/A
Student Population (2014-2015): 1,700
Grade Levels: 9-12
Notes/Comments from School Site:
Total Number of Classrooms: 79
Number of Portables: 10 • Traffic is terrible given the ‘one way in, one
way out’ pattern
• A stadium with a turf field and synthetic track
is needed
• Shop spaces for Auto Shop, Wood Shop and
Agriculture are needed
5.59 EXISTING CONDITIONS ASSESSMENT Facilities Master Plan 403