Page 439 - Facilities Master Plan 2016
P. 439

agriculture are needed
                                                                                                        •  Expand science classrooms; need
                                                                                                           additional space
                                                                                                        •  Replace existing portables with           All images taken by LPA.
                                                                                                           permanent construction
                                                                                                        •  Repair or replace existing gym and
                                                                                                           performing arts swamp coolers
                                                                                                        •  All existing AC pavement needs an
                                                                                                           overlay and patching
                                                                                                        •  Missing acoustical ceiling tiles in the
                                                                                                           dance room need to be replaced
                                                                                                        •  The boys and girls locker rooms need
                                                                                                           a major modernization; they are in their
                                                                                                           original state
                                                                                                        •  Expand the lobby at the existing gym
                                                                                                           entrance (too many people)
                                                                                                        •  Enlarge the track and pool restrooms;
                                                                                                           include a custodial space


                                                                                                        Notes from Maintenance & Operations:
        1111 Century Boulevard, Lodi, CA 95240
                                                                                                        •  Upgrade exterior pole lights
        EXISTING SITE INFORMATION                        CONDITION ASSESSMENT                           •  Replace chiller at Performing Arts
                                                                                                           building and coolers at Gym and dance
        Year Built: 1975                                 Recently Completed Work:                          and wrestling room units
        Site Acreage: 47.14 acres                                                                       •  Replace 5 water heaters
                                                         •  N/A                                         •  Portables may need siding repaired;
        Student Population (2014-2015): 2,100                                                              ramps and railings at portables should
        Grade Levels: 9-12                                                                                 be replaced
                                                         Notes/Comments from School Site:               •  Re-key, replace 20% of door hardware
        Total Number of Classrooms: 92                                                                  •  Replace 50% of perimeter chainlink
        Number of Portables: 18                          •  The tennis courts need to be resurfaced        fence
                                                         •  Uneven fields need to be repaired           •  Re-roof 6 portables
                                                         •  A shade structure for the amphitheater is   •  Needs asphalt overlay at parking and
                                                            needed                                         playgrounds
                                                         •  A second gymnasium is needed                •  Need new mop sinks
                                                         •  CTE spaces for wood shop, auto shop and     •  Replace pump and filtration system


        5.60       EXISTING CONDITIONS ASSESSMENT                                                                              Facilities Master Plan  413
                   TOKAY HS                                                                                                Lodi Unified School District
   434   435   436   437   438   439   440   441   442   443   444