Page 439 - Facilities Master Plan 2016
P. 439
agriculture are needed
• Expand science classrooms; need
additional space
• Replace existing portables with All images taken by LPA.
permanent construction
• Repair or replace existing gym and
performing arts swamp coolers
• All existing AC pavement needs an
overlay and patching
• Missing acoustical ceiling tiles in the
dance room need to be replaced
• The boys and girls locker rooms need
a major modernization; they are in their
original state
• Expand the lobby at the existing gym
entrance (too many people)
• Enlarge the track and pool restrooms;
include a custodial space
Notes from Maintenance & Operations:
1111 Century Boulevard, Lodi, CA 95240
• Upgrade exterior pole lights
EXISTING SITE INFORMATION CONDITION ASSESSMENT • Replace chiller at Performing Arts
building and coolers at Gym and dance
Year Built: 1975 Recently Completed Work: and wrestling room units
Site Acreage: 47.14 acres • Replace 5 water heaters
• N/A • Portables may need siding repaired;
Student Population (2014-2015): 2,100 ramps and railings at portables should
Grade Levels: 9-12 be replaced
Notes/Comments from School Site: • Re-key, replace 20% of door hardware
Total Number of Classrooms: 92 • Replace 50% of perimeter chainlink
Number of Portables: 18 • The tennis courts need to be resurfaced fence
• Uneven fields need to be repaired • Re-roof 6 portables
• A shade structure for the amphitheater is • Needs asphalt overlay at parking and
needed playgrounds
• A second gymnasium is needed • Need new mop sinks
• CTE spaces for wood shop, auto shop and • Replace pump and filtration system
5.60 EXISTING CONDITIONS ASSESSMENT Facilities Master Plan 413
TOKAY HS Lodi Unified School District